Projects

| Home | Engineering | Cranes | Haulage | Contact Us |

(Click on image to see an enlarged view)

Fuel Storage Tanks

Manufactured & Installed by Port Adelaide Construction

using Submerged Arc Welding

shell tank 14.jpg (1948759 bytes)    shell tank atw welding 001.jpg (2050445 bytes)

 

Diesel Storage Tanks

Fabricated & Transported

FUEL TANKS.JPG (381599 bytes)

 

Cyclone Section

Fabricated & Installed

Engineering Work001.jpg (281015 bytes)

 

Gas Train

Fabricated

2004 Olympic Cauldron 1.jpg (143953 bytes)    2004 Olympic Gas Train.jpg (53622 bytes)

 

Stainless Steel Cooler

Fabricated & Installed

Cooler 2.jpg (50956 bytes)

 

Mild Steel Analysis Tanks

Fabricated

Thermo Gamma Tank.jpg (187548 bytes)

 

Electro Filter Inlet Duct

Fabricated & Installed

Electro Filter Intlet Duct.jpg (384864 bytes)

 

Damper Valve

Fabricated

Damper Valve001.jpg (298368 bytes)

 

Tank Roof

Fabricated & Installed

Tank Lid 1.jpg (213870 bytes)    Tank Lid 2.jpg (203077 bytes)

 

Maintenance Work

Maint Work002.jpg (303550 bytes)    Maint. Work.JPG (327334 bytes)    Zinifex Shut Down 1.jpg (317245 bytes)

 

Tank & Pipework

Relocation of tank plus Pipe Fabrication & Installation

Pacific Term. Aerial.jpg (2069277 bytes)

 

Cyclone Cluster

Fabricated

Linatex-cyclone cluster 002.jpg (2106934 bytes)